logo
login
 
Funds raised US$838,113,622
Nets funded 370,995,549
People protected 667,791,988

Kongo Central Province, 2026, Congo (Dem. Rep.)  

Summary

Nets: 3,929,200 LLINs
When: Aug-Sep 26
Distributed by:  PNLP/SANRU


3.9 million nets will be distributed in all 31 health zones to achieve universal coverage (all sleeping spaces covered) across a population of some 7.0 million people.
Map

Details

 

Donations funding nets    

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 88,121 donations from 21,775 donors in 14 countries
  • Smallest donation: €1.00, largest donation: US$25,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
163,700   Boko Kivulu ZdS Aug-Sep 26 Status
98,550   Boma Bungu ZdS Aug-Sep 26 Status
340,950   Boma ZdS Aug-Sep 26 Status
72,850   Gombe Matadi ZdS Aug-Sep 26 Status
79,500   Inga ZdS Aug-Sep 26 Status
80,000   Kangu ZdS Aug-Sep 26 Status
47,050   Kibunzi ZdS Aug-Sep 26 Status
78,900   Kimpangu ZdS Aug-Sep 26 Status
202,000   Kimpese ZdS Aug-Sep 26 Status
54,850   Kimvula ZdS Aug-Sep 26 Status
42,150   Kinkonzi ZdS Aug-Sep 26 Status
241,400   Kisantu ZdS Aug-Sep 26 Status
68,000   Kitona ZdS Aug-Sep 26 Status
50,200   Kizu ZdS Aug-Sep 26 Status
60,600   Kuimba ZdS Aug-Sep 26 Status
170,500   Kwilu Ngongo ZdS Aug-Sep 26 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
152,750   Lukula ZdS Aug-Sep 26 Status
61,400   Luozi ZdS Aug-Sep 26 Status
34,050   Mangembo ZdS Aug-Sep 26 Status
150,850   Massa ZdS Aug-Sep 26 Status
483,700   Matadi ZdS Aug-Sep 26 Status
189,100   Mbanza Ngungu ZdS Aug-Sep 26 Status
217,850   Muanda ZdS Aug-Sep 26 Status
94,300   Ngidinga ZdS Aug-Sep 26 Status
57,800   Nselo ZdS Aug-Sep 26 Status
119,450   Nsona Mpangu ZdS Aug-Sep 26 Status
212,950   Nzanza ZdS Aug-Sep 26 Status
129,450   Seke Banza ZdS Aug-Sep 26 Status
70,050   Sona Bata ZdS Aug-Sep 26 Status
51,200   Tshela ZdS Aug-Sep 26 Status
53,100   Vaku ZdS Aug-Sep 26 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete