logo
log in   
 
Participants 542,533
US$ 248,131,326
Nets 114,717,998

Tshopo Province, 2020, Congo (Dem. Rep.)  

Summary

Nets: 2,323,650 LLINs
When: Nov 20
Distributed by:  PNLP/TBD


2.3 million nets will be distributed in all 23 of the health zones in Tshopo province to achieve universal coverage of a population of 4.2 million people. This is part of a commitment made by AMF to fund 16.2 million nets for distribution in DRC in 2020.
Map

Details

 

Donations funding nets     view donations funding non-net costs

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 9,677 donations from 5,203 donors in 76 countries
  • Smallest donation: US$1.00, largest donation: US$100,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
49,850   Bafwagbogbo ZdS, Tshopo Province Nov 20 Status
57,850   Bafwasende ZdS, Tshopo Province Nov 20 Status
100,600   Banalia ZdS, Tshopo Province Nov 20 Status
62,950   Basali ZdS, Tshopo Province Nov 20 Status
126,100   Basoko ZdS, Tshopo Province Nov 20 Status
79,400   Bengamisa ZdS, Tshopo Province Nov 20 Status
113,050   Isangi ZdS, Tshopo Province Nov 20 Status
125,200   Kabondo ZdS, Tshopo Province Nov 20 Status
87,450   Lowa ZdS, Tshopo Province Nov 20 Status
119,600   Lubunga ZdS, Tshopo Province Nov 20 Status
231,000   Makiso-Kisangani ZdS, Tshopo Pro… Nov 20 Status
167,200   Mangobo ZdS, Tshopo Province Nov 20 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
88,600   Opala ZdS, Tshopo Province Nov 20 Status
48,300   Opienge ZdS, Tshopo Province Nov 20 Status
124,350   Tshopo ZdS, Tshopo Province Nov 20 Status
76,800   Ubundu ZdS, Tshopo Province Nov 20 Status
67,850   Wanie Rukula ZdS, Tshopo Province Nov 20 Status
123,450   Yabaondo ZdS, Tshopo Province Nov 20 Status
63,000   Yahisuli ZdS, Tshopo Province Nov 20 Status
134,350   Yahuma ZdS, Tshopo Province Nov 20 Status
115,800   Yakusu ZdS, Tshopo Province Nov 20 Status
88,800   Yaleko ZdS, Tshopo Province Nov 20 Status
72,100   Yalimbongo ZdS, Tshopo Province Nov 20 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete