logo
login
 
Funds raised US$1,114,480,493
Nets funded 509,242,956
People protected 916,637,321

Ituri Province, 2026, Congo (Dem. Rep.)  

Summary

Nets: 4,437,550 LLINs
When: Jul 27
Distributed by:  NMCP/Various


4.4 million nets will be distributed in all 36 health zones to achieve universal coverage (all sleeping spaces covered) across a population of some 7.9 million people.
Map

Details

 

Donations funding nets    

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 4,692 donations from 3,307 donors in 73 countries
  • Smallest donation: US$1.00, largest donation: US$250,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
159,300   Adi ZdS Jul 27 Status
93,500   Adja ZdS Jul 27 Status
134,000   Angumu ZdS Jul 27 Status
185,450   Ariwara ZdS Jul 27 Status
151,050   Aru ZdS Jul 27 Status
120,600   Aungba ZdS Jul 27 Status
85,600   Bambu ZdS Jul 27 Status
81,700   Biringi ZdS Jul 27 Status
52,200   Boga ZdS Jul 27 Status
425,450   Bunia ZdS Jul 27 Status
77,000   Damas ZdS Jul 27 Status
86,200   Drodro ZdS Jul 27 Status
118,700   Fataki ZdS Jul 27 Status
169,200   Gety ZdS Jul 27 Status
75,800   Jiba ZdS Jul 27 Status
84,450   Kambala ZdS Jul 27 Status
27,000   Kilo ZdS Jul 27 Status
164,100   Komanda ZdS Jul 27 Status
117,900   Laybo ZdS Jul 27 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
65,100   Linga ZdS Jul 27 Status
101,450   Lita ZdS Jul 27 Status
181,400   Logo ZdS Jul 27 Status
63,300   Lolwa ZdS Jul 27 Status
157,650   Mahagi ZdS Jul 27 Status
95,700   Mambasa ZdS Jul 27 Status
157,900   Mandima ZdS Jul 27 Status
75,700   Mangala ZdS Jul 27 Status
102,500   Mongbwalu ZdS Jul 27 Status
94,750   Nia Nia ZdS Jul 27 Status
138,850   Nizi ZdS Jul 27 Status
72,600   Nyankunde ZdS Jul 27 Status
182,900   Nyarambe ZdS Jul 27 Status
133,500   Rethy ZdS Jul 27 Status
162,400   Rimba ZdS Jul 27 Status
162,900   Rwampara ZdS Jul 27 Status
79,750   Tchomia ZdS Jul 27 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete

These nets were left over from a prior distribution in another province so we do not need to allocate donations here to fund them, as their cost was covered in the previous distribution.