logo
login
 
Funds raised US$1,114,418,189
Nets funded 509,211,804
People protected 916,581,247

Sokoto State, Nigeria  

Summary

Nets: 3,709,550 LLINs
When: Jun 27
Distributed by:  NMCP/Various


3.7 million nets will be distributed across all 23 LGAs to achieve universal coverage (all sleeping spaces covered)
Map

Details

 

Donations funding nets    

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
105,400   Binji LGA Jun 27 Status
176,000   Bodinga LGA Jun 27 Status
195,200   Dange-Shuni LGA Jun 27 Status
249,100   Gada LGA Jun 27 Status
182,900   Goronyo LGA Jun 27 Status
95,850   Gudu LGA Jun 27 Status
232,150   Gwadabawa LGA Jun 27 Status
151,000   Illela LGA Jun 27 Status
146,600   Isa LGA Jun 27 Status
125,100   Kebbe LGA Jun 27 Status
134,350   Kware LGA Jun 27 Status
149,650   Rabah LGA Jun 27 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
208,300   Sabon Birni LGA Jun 27 Status
156,950   Shagari LGA Jun 27 Status
104,750   Silame LGA Jun 27 Status
233,650   Sokoto North LGA Jun 27 Status
195,600   Sokoto South LGA Jun 27 Status
225,700   Tambuwal LGA Jun 27 Status
114,250   Tangaza LGA Jun 27 Status
68,600   Tureta LGA Jun 27 Status
180,200   Wamako LGA Jun 27 Status
162,850   Wurno LGA Jun 27 Status
115,400   Yabo LGA Jun 27 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete

These nets were left over from a prior distribution in another province so we do not need to allocate donations here to fund them, as their cost was covered in the previous distribution.