Funds raised US$832,695,311
Nets funded 370,210,379
People protected 666,378,682

Kebbi State, 2025, Nigeria  

Summary

Nets: 3,181,600 LLINs
When: Apr 26
Distributed by:  NMCP/Various


3.2 million nets will be distributed in all 21 health zones to achieve universal coverage (all sleeping spaces covered) across a population of some 5.8 million people.
Map

Details

 

Distribution

The distribution of nets typically takes place over a week to several months. The area District Health Service and staff typically take the lead in carrying out the on-the-ground distribution with the support and partnership of other organisations, often local or international NGOs, and with the national oversight of the National Malaria Control Program (NMCP), part of the Ministry of Health (MoH), and other funding and otherwise-contributing partners that form a distribution Task Force. Documentation is sought that shows nets were distributed as intended to beneficiaries. A distribution is typically divided into a series of locations.

Summary

  • Distribution took place between: TBA (to be advised)
  • Number of nets distributed: TBA
 

Locations

A distribution sometimes takes place in a number of locations. Each location may have its own pictures and video.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
65,550   Aleiro LGA Apr 26 Status Photos expected Videos expected
185,350   Arewa Dandi LGA Apr 26 Status Photos expected Videos expected
195,650   Argungu LGA Apr 26 Status Photos expected Videos expected
113,700   Augie LGA Apr 26 Status Photos expected Videos expected
232,550   Bagudo LGA Apr 26 Status Photos expected Videos expected
262,450   Birnin Kebbi LGA Apr 26 Status Photos expected Videos expected
120,700   Bunza LGA Apr 26 Status Photos expected Videos expected
142,850   Dandi LGA Apr 26 Status Photos expected Videos expected
117,000   Fakai LGA Apr 26 Status Photos expected Videos expected
147,600   Gwandu LGA Apr 26 Status Photos expected Videos expected
193,200   Jega LGA Apr 26 Status Photos expected Videos expected

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
82,950   Kalgo LGA Apr 26 Status Photos expected Videos expected
151,250   Koko/Besse LGA Apr 26 Status Photos expected Videos expected
169,750   Maiyama LGA Apr 26 Status Photos expected Videos expected
123,200   Ngaski LGA Apr 26 Status Photos expected Videos expected
89,600   Sakaba LGA Apr 26 Status Photos expected Videos expected
124,200   Shanga LGA Apr 26 Status Photos expected Videos expected
145,100   Suru LGA Apr 26 Status Photos expected Videos expected
259,150   Wasagu/Danko LGA Apr 26 Status Photos expected Videos expected
98,250   Yauri LGA Apr 26 Status Photos expected Videos expected
161,550   Zuru LGA Apr 26 Status Photos expected Videos expected

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete