Ituri Province, 2026, Congo (Dem. Rep.)  

Summary

Nets: 4,437,550 LLINs
When: Sep 26
Distributed by:  NMCP/Various


4.4 million nets will be distributed in all 36 health zones to achieve universal coverage (all sleeping spaces covered) across a population of some 7.9 million people.
Map

Details

 

Donations funding nets    

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 8 donations from 1 donors in 1 countries
  • Smallest donation: US$250,000.00, largest donation: US$250,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
159,300   Adi ZdS Sep 26 Status
93,500   Adja ZdS Sep 26 Status
134,000   Angumu ZdS Sep 26 Status
185,450   Ariwara ZdS Sep 26 Status
151,050   Aru ZdS Sep 26 Status
120,600   Aungba ZdS Sep 26 Status
85,600   Bambu ZdS Sep 26 Status
81,700   Biringi ZdS Sep 26 Status
52,200   Boga ZdS Sep 26 Status
425,450   Bunia ZdS Sep 26 Status
77,000   Damas ZdS Sep 26 Status
86,200   Drodro ZdS Sep 26 Status
118,700   Fataki ZdS Sep 26 Status
169,200   Gety ZdS Sep 26 Status
75,800   Jiba ZdS Sep 26 Status
84,450   Kambala ZdS Sep 26 Status
27,000   Kilo ZdS Sep 26 Status
164,100   Komanda ZdS Sep 26 Status
117,900   Laybo ZdS Sep 26 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
65,100   Linga ZdS Sep 26 Status
101,450   Lita ZdS Sep 26 Status
181,400   Logo ZdS Sep 26 Status
63,300   Lolwa ZdS Sep 26 Status
157,650   Mahagi ZdS Sep 26 Status
95,700   Mambasa ZdS Sep 26 Status
157,900   Mandima ZdS Sep 26 Status
75,700   Mangala ZdS Sep 26 Status
102,500   Mongbwalu ZdS Sep 26 Status
94,750   Nia Nia ZdS Sep 26 Status
138,850   Nizi ZdS Sep 26 Status
72,600   Nyankunde ZdS Sep 26 Status
182,900   Nyarambe ZdS Sep 26 Status
133,500   Rethy ZdS Sep 26 Status
162,400   Rimba ZdS Sep 26 Status
162,900   Rwampara ZdS Sep 26 Status
79,750   Tchomia ZdS Sep 26 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete