logo
My page   
 
Participants 476,847
US$ 17,951,119
Nets 4,234,556

Net distributions - Namibia

Map
Zoom out 

Zoom out


Zoom out to

World
Africa
Namibia

Distribution status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete

Net condition

   
  • Expected
  • Not expected
  • Partner Refused
   Net condition
  • Very good/good
  • Acceptable
  • Not OK

Survey status and net condition

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

   Survey status
  • Expected
  • Not expected
  • Partner Refused
   Net condition
  • Very good/good
  • Acceptable
  • Not OK
 Surveys
# LLINs Location CountryWhen By whomStatus  1234
3,500   Caprivi flag Namibia Sep-Oct 06 Logo PSI status Photos Not expected Not expected Not expected Not expected
3,100   Kavango flag Namibia Sep-Oct 06 Logo PSI status Photos Not expected Not expected Not expected Not expected
3,000   Ohangwena flag Namibia Sep-Oct 06 Logo PSI status Photos Not expected Not expected Not expected Not expected
3,000   Capr/Kava/Ohang flag Namibia May-Jun 06 Logo Red Cross status Photos Not expected Not expected Not expected Not expected

Distributions in Namibia
12,600 LLINs *