Kebbi State, 2025, Nigeria  

Summary

Nets: 3,181,600 LLINs
When: Jan 26
Distributed by:  NMCP/Various


3.2 million nets will be distributed in all 21 health zones to achieve universal coverage (all sleeping spaces covered) across a population of some 5.8 million people.
Map

Details

 

Donations funding nets    

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 0 donations from 0 donors in 0 countries
  • Smallest donation: 1.00, largest donation: 0
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
65,550   Aleiro LGA Jan 26 Status
185,350   Arewa Dandi LGA Jan 26 Status
195,650   Argungu LGA Jan 26 Status
113,700   Augie LGA Jan 26 Status
232,550   Bagudo LGA Jan 26 Status
262,450   Birnin Kebbi LGA Jan 26 Status
120,700   Bunza LGA Jan 26 Status
142,850   Dandi LGA Jan 26 Status
117,000   Fakai LGA Jan 26 Status
147,600   Gwandu LGA Jan 26 Status
193,200   Jega LGA Jan 26 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
82,950   Kalgo LGA Jan 26 Status
151,250   Koko/Besse LGA Jan 26 Status
169,750   Maiyama LGA Jan 26 Status
123,200   Ngaski LGA Jan 26 Status
89,600   Sakaba LGA Jan 26 Status
124,200   Shanga LGA Jan 26 Status
145,100   Suru LGA Jan 26 Status
259,150   Wasagu/Danko LGA Jan 26 Status
98,250   Yauri LGA Jan 26 Status
161,550   Zuru LGA Jan 26 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed