logo
login
 
Funds raised US$760,713,553
Nets funded 345,402,739
People protected 621,724,930

Akwa Ibom State, 2025, Nigeria  

Summary

Nets: 3,982,100 LLINs
When: Jan 26
Distributed by:  NMCP/Various


4.0 million nets will be distributed in all 31 health zones to achieve universal coverage (all sleeping spaces covered) across a population of some 7.2 million people.
Map

Details

 

Donations funding nets    

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 0 donations from 0 donors in 0 countries
  • Smallest donation: 1.00, largest donation: 0
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
141,950   Abak LGA Jan 26 Status
61,200   Eastern Obolo LGA Jan 26 Status
176,400   Eket LGA Jan 26 Status
64,650   Esit Eket LGA Jan 26 Status
197,250   Essien Udim LGA Jan 26 Status
108,100   Etim Ekpo LGA Jan 26 Status
172,400   Etinan LGA Jan 26 Status
76,400   Ibeno LGA Jan 26 Status
139,950   Ibesikpo Asutan LGA Jan 26 Status
192,450   Ibiono Ibom LGA Jan 26 Status
74,250   Ika LGA Jan 26 Status
134,350   Ikono LGA Jan 26 Status
135,350   Ikot Abasi LGA Jan 26 Status
144,300   Ikot Ekpene LGA Jan 26 Status
101,100   Ini LGA Jan 26 Status
130,500   Itu LGA Jan 26 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
104,250   Mbo LGA Jan 26 Status
180,950   Mkpat Enin LGA Jan 26 Status
74,900   Nsit Atai LGA Jan 26 Status
110,300   Nsit Ibom LGA Jan 26 Status
129,700   Nsit Ubium LGA Jan 26 Status
150,300   Obot Akara LGA Jan 26 Status
104,850   Okobo LGA Jan 26 Status
125,700   Onna LGA Jan 26 Status
89,000   Oron LGA Jan 26 Status
175,350   Oruk Anam LGA Jan 26 Status
54,150   Udung Uko LGA Jan 26 Status
128,050   Ukanafun LGA Jan 26 Status
119,550   Uruan LGA Jan 26 Status
72,200   Urue Offong/Oruko LGA Jan 26 Status
312,250   Uyo LGA Jan 26 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete