Funds raised US$635,019,392
Nets funded 282,967,559
People protected 509,341,606

Distributed by Project Muso

Project Muso Ladamunen (the Project for the Empowered Woman) was launched in June 2005. Through four principle initiatives, Women’s Education Program, Springboard Microfinance Program, Community-Based Malaria Program, Community Action Committee, Project Muso equips participants with skills and resources to resolve the root causes of disease.

LLINs

What is a Long-Lasting Insecticidal Net (LLIN)?

An LLIN is a mosquito net impregnated with insecticide.

The insecticide is cleverly bound within the fibres that make up the netting and is 'slow released' over a 4-5 year period. Hence 'long lasting'.

more...

Yirimadjo, Mali  

Nets: 22,000 LLINs
When: Jul-Sep 11
Distributed by  Project Muso    Project Muso


The community of Yirimadjo of some 56,000 people lies to the south east of the capital Bamako. Malaria is a significant problem here: 50% of all medical cases are malaria related and 40% of children tested have malaria.

A household by household survey will establish [Update, 17Jun11: has now established] the exact number of nets needed to achieve universal coverage so that all sleeping spaces can be covered with a net.

Documentation

Map

Locations

A distribution sometimes takes place in a number of locations. Each location may have its own pictures and video.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  Surveys
4,195   Yarimadjo-Centre Jul-Sep 11 Status Photos Videos
5,595   Yarimadjo-East Jul-Sep 11 Status Photos Videos
5,715   Yarimadjo-NorthWest Jul-Sep 11 Status Photos Videos
6,495   Yarimadjo-SouthWest Jul-Sep 11 Status Photos Videos

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete

Survey status and net condition

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

   Survey status
  • Expected
  • Not expected
  • Partner Refused
   Net condition
  • Very good/good
  • Acceptable
  • Not OK

Yarimadjo-NorthWest, Mali

 

Status Distribution complete Distribution complete

The distribution was completed successfully as planned.