logo
login
 
Funds raised US$852,679,629
Nets funded 378,342,524
People protected 681,016,543

Mongala Province, 2025, Congo (Dem. Rep.)  

Summary

Nets: 2,145,150 LLINs
When: Aug 26
Distributed by:  PNLP/TBD


2.1 million nets will be distributed in all 12 health zones to achieve universal coverage (all sleeping spaces covered) across a population of some 3.8 million people.
Map

Details

 

Distribution

The distribution of nets typically takes place over a week to several months. The area District Health Service and staff typically take the lead in carrying out the on-the-ground distribution with the support and partnership of other organisations, often local or international NGOs, and with the national oversight of the National Malaria Control Program (NMCP), part of the Ministry of Health (MoH), and other funding and otherwise-contributing partners that form a distribution Task Force. Documentation is sought that shows nets were distributed as intended to beneficiaries. A distribution is typically divided into a series of locations.

Summary

  • Distribution took place between: TBA (to be advised)
  • Number of nets distributed: TBA
 

Locations

A distribution sometimes takes place in a number of locations. Each location may have its own pictures and video.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
245,950   Binga ZdS Aug 26 Status Photos expected Videos expected
124,800   Bongandanga ZdS Aug 26 Status Photos expected Videos expected
116,350   Boso Manzi ZdS Aug 26 Status Photos expected Videos expected
125,400   Boso Mondanda ZdS Aug 26 Status Photos expected Videos expected
176,900   Bosondjo ZdS Aug 26 Status Photos expected Videos expected
203,500   Bumba ZdS Aug 26 Status Photos expected Videos expected
294,200   Lisala ZdS Aug 26 Status Photos expected Videos expected

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
111,850   Lolo ZdS Aug 26 Status Photos expected Videos expected
229,950   Pimu ZdS Aug 26 Status Photos expected Videos expected
124,600   Yamaluka ZdS Aug 26 Status Photos expected Videos expected
264,600   Yambuku ZdS Aug 26 Status Photos expected Videos expected
127,050   Yamongili ZdS Aug 26 Status Photos expected Videos expected

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete

Binga ZdS, Congo (Dem. Rep.)

 

Status Being distributed Being distributed