logo
login
 
Funds raised US$1,117,400,732
Nets funded 496,711,737
People protected 894,081,127

Rivers State, Nigeria  

Summary

Nets: 5,840,300 LLINs
When: Jun 27
Distributed by:  NMCP/Various


5.8 million nets will be distributed in all 23 health zones to achieve universal coverage (all sleeping spaces covered) across a population of some 10.4 million people.
Map

Details

 

Donations funding nets    

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 11,897 donations from 5,532 donors in 79 countries
  • Smallest donation: AUD1.00, largest donation: CAD245,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
317,250   Abua/Odual LGA Jun 27 Status
186,850   Ahoada East LGA Jun 27 Status
280,000   Ahoada West LGA Jun 27 Status
181,000   Akuku Toru LGA Jun 27 Status
244,800   Andoni LGA Jun 27 Status
246,900   Asari-Toru LGA Jun 27 Status
241,500   Bonny LGA Jun 27 Status
280,250   Degema LGA Jun 27 Status
213,650   Eleme LGA Jun 27 Status
225,850   Emohua LGA Jun 27 Status
280,800   Etche LGA Jun 27 Status
262,650   Gokana LGA Jun 27 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
212,250   Ikwerre LGA Jun 27 Status
329,100   Khana LGA Jun 27 Status
519,400   Obia/Akpor LGA Jun 27 Status
318,250   Ogba/Egbema/Ndoni LGA Jun 27 Status
84,600   Ogu/Bolo LGA Jun 27 Status
249,700   Okrika LGA Jun 27 Status
112,800   Omumma LGA Jun 27 Status
171,700   Opobo/Nkoro LGA Jun 27 Status
140,800   Oyigbo LGA Jun 27 Status
605,050   Port-Harcourt LGA Jun 27 Status
135,150   Tai LGA Jun 27 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete

These nets were left over from a prior distribution in another province so we do not need to allocate donations here to fund them, as their cost was covered in the previous distribution.