log in   
 
Participants 532,615
US$ 177,781,174
Nets 79,852,605

4 Regions, 2019, Guinea  

Summary

Nets: 3,860,000 LLINs
When: Mar-Apr 19
Distributed by:  NMCP/Various


3.86 million nets will be distributed in 20 districts in four regions to achieve universal coverage of a population of 6.9 million people. Note: We have ring-fenced further funds should reliable data from the household-level registration indicate further nets are required to achieve universal coverage.
Map

Details

 

Donations funding nets    

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • Total funding required for nets: US$7,000,000 (est)
  • 15,174 donations from 6,984 donors in 80 countries
  • Smallest donation: US$1.00, largest donation: US$500,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
159,500   Boké Région, Boffa Préfecture Mar-Apr 19 Status
312,000   Boké Région, Boké Préfecture Mar-Apr 19 Status
83,500   Boké Région, Fria Préfecture Mar-Apr 19 Status
140,500   Boké Région, Gaoual Préfecture Mar-Apr 19 Status
92,000   Boké Région, Koundara Préfecture Mar-Apr 19 Status
113,500   Faranah Région, Dabola Préfecture Mar-Apr 19 Status
140,000   Faranah Région, Dinguiraye Préfe... Mar-Apr 19 Status
150,250   Faranah Région, Faranah Préfecture Mar-Apr 19 Status
211,000   Faranah Région, Kissidougou Préf... Mar-Apr 19 Status
302,500   Kankan Région, Kankan Préfecture Mar-Apr 19 Status
152,000   Kankan Région, Kerouane Préfecture Mar-Apr 19 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
153,000   Kankan Région, Kouroussa Préfecture Mar-Apr 19 Status
179,500   Kankan Région, Mandiana Préfecture Mar-Apr 19 Status
288,500   Kankan Région, Siguiri Préfecture Mar-Apr 19 Status
164,500   Nzerekoré Région, Beyla Préfecture Mar-Apr 19 Status
356,000   Nzerekoré Région, Gueckedou Pré... Mar-Apr 19 Status
157,000   Nzerekoré Région, Lola Préfecture Mar-Apr 19 Status
285,000   Nzerekoré Région, Macenta Préfe... Mar-Apr 19 Status
288,250   Nzerekoré Région, Nzerekoré Pr... Mar-Apr 19 Status
131,500   Nzerekoré Région, Yomou Préfecture Mar-Apr 19 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete