Summary

Nets: 4,800,000 LLINs
When: Mar-Apr 19
Distributed by:  NMCP/Various


3.86 million nets will be distributed in 20 districts in four regions to achieve universal coverage of a population of 6.9 million people. Note: We have ring-fenced further funds should reliable data from the household-level registration indicate further nets are required to achieve universal coverage.
Map

Details

 

Distribution

The distribution of nets typically takes place over a week to several months. The area District Health Service and staff typically take the lead in carrying out the on-the-ground distribution with the support and partnership of other organisations, often local or international NGOs, and with the national oversight of the National Malaria Control Program (NMCP), part of the Ministry of Health (MoH), and other funding and otherwise-contributing partners that form a distribution Task Force. Documentation is sought that shows nets were distributed as intended to beneficiaries. A distribution is typically divided into a series of locations.

Summary

  • Distribution was split into four waves, which took place between April and July 2019.
  • Wave 4 took place in late July, making use of a second shipment of AMF-funded nets, sent after registration demonstrated that the net need was higher than initial estimates.
  • Distribution data is still being entered and validated.
 

Locations

A distribution sometimes takes place in a number of locations. Each location may have its own pictures and video.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
150,000   Boké Région, Boffa Préfecture Mar-Apr 19 Status Photos expected Videos expected
333,500   Boké Région, Boké Préfecture Mar-Apr 19 Status Photos expected Videos expected
72,000   Boké Région, Fria Préfecture Mar-Apr 19 Status Photos expected Videos expected
134,000   Boké Région, Gaoual Préfecture Mar-Apr 19 Status Photos expected Videos expected
95,500   Boké Région, Koundara Préfecture Mar-Apr 19 Status Photos expected Videos expected
133,000   Faranah Région, Dabola Préfecture Mar-Apr 19 Status Photos expected Videos expected
155,500   Faranah Région, Dinguiraye Préfe... Mar-Apr 19 Status Photos expected Videos expected
241,500   Faranah Région, Faranah Préfecture Mar-Apr 19 Status Photos expected Videos expected
230,500   Faranah Région, Kissidougou Préf... Mar-Apr 19 Status Photos expected Videos expected
452,500   Kankan Région, Kankan Préfecture Mar-Apr 19 Status Photos expected Videos expected
176,000   Kankan Région, Kerouane Préfecture Mar-Apr 19 Status Photos expected Videos expected

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
212,000   Kankan Région, Kouroussa Préfecture Mar-Apr 19 Status Photos expected Videos expected
355,000   Kankan Région, Mandiana Préfecture Mar-Apr 19 Status Photos expected Videos expected
579,000   Kankan Région, Siguiri Préfecture Mar-Apr 19 Status Photos expected Videos expected
248,500   Nzerekoré Région, Beyla Préfecture Mar-Apr 19 Status Photos expected Videos expected
278,000   Nzerekoré Région, Gueckedou Pré... Mar-Apr 19 Status Photos expected Videos expected
155,000   Nzerekoré Région, Lola Préfecture Mar-Apr 19 Status Photos expected Videos expected
278,000   Nzerekoré Région, Macenta Préfe... Mar-Apr 19 Status Photos expected Videos expected
402,500   Nzerekoré Région, Nzerekoré Pr... Mar-Apr 19 Status Photos expected Videos expected
118,000   Nzerekoré Région, Yomou Préfecture Mar-Apr 19 Status Photos expected Videos expected

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete

Nzerekoré Région, Nzerekoré Préfecture, Guinea

 

Status Distribution complete Distribution complete