Tshopo Province, 2020, Congo (Dem. Rep.)  

Summary

Nets: 2,168,750 LLINs
When: Nov 20
Distributed by:  PNLP/TBD


2.2 million nets will be distributed in all 23 of the health zones in Tshopo province to achieve universal coverage of a population of 3.9 million people. This is part of a commitment made by AMF to fund 16.2 million nets for distribution in DRC in 2020.
Map

Details

 

Donations funding nets     view donations funding non-net costs

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • Total funding required for nets: US$4,337,500 (est)
  • 10,506 donations from 5,489 donors in 80 countries
  • Smallest donation: £1.00, largest donation: US$100,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
46,450   Bafwagbogbo ZdS, Tshopo Province Nov 20 Status
54,000   Bafwasende ZdS, Tshopo Province Nov 20 Status
93,900   Banalia ZdS, Tshopo Province Nov 20 Status
58,750   Basali ZdS, Tshopo Province Nov 20 Status
117,700   Basoko ZdS, Tshopo Province Nov 20 Status
74,100   Bengamisa ZdS, Tshopo Province Nov 20 Status
105,500   Isangi ZdS, Tshopo Province Nov 20 Status
116,850   Kabondo ZdS, Tshopo Province Nov 20 Status
81,600   Lowa ZdS, Tshopo Province Nov 20 Status
111,650   Lubunga ZdS, Tshopo Province Nov 20 Status
215,600   Makiso-Kisangani ZdS, Tshopo Pro… Nov 20 Status
156,050   Mangobo ZdS, Tshopo Province Nov 20 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
82,700   Opala ZdS, Tshopo Province Nov 20 Status
45,100   Opienge ZdS, Tshopo Province Nov 20 Status
116,050   Tshopo ZdS, Tshopo Province Nov 20 Status
71,700   Ubundu ZdS, Tshopo Province Nov 20 Status
63,350   Wanie Rukula ZdS, Tshopo Province Nov 20 Status
115,200   Yabaondo ZdS, Tshopo Province Nov 20 Status
58,800   Yahisuli ZdS, Tshopo Province Nov 20 Status
125,400   Yahuma ZdS, Tshopo Province Nov 20 Status
108,100   Yakusu ZdS, Tshopo Province Nov 20 Status
82,900   Yaleko ZdS, Tshopo Province Nov 20 Status
67,300   Yalimbongo ZdS, Tshopo Province Nov 20 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete