Tshopo Province, Congo (Dem. Rep.)  

Summary

Nets: 2,168,750 LLINs
When: Jul-Sep 20
Distributed by:  PNLP/TBD


2.2 million nets will be distributed in all 23 of the health zones in Tshopo province to achieve universal coverage of a population of 3.9 million people. This is part of a commitment made by AMF to fund 16.2 million nets for distribution in DRC in 2020.
Map

Details

 

Donations funding nets     view donations funding non-net costs

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • Total funding required for nets: US$4,337,500 (est)
  • 8,143 donations from 4,977 donors in 76 countries
  • Smallest donation: £1.00, largest donation: US$200,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
46,450   Bafwagbogbo ZdS, Tshopo Province Jul-Sep 20 Status
54,000   Bafwasende ZdS, Tshopo Province Jul-Sep 20 Status
93,900   Banalia ZdS, Tshopo Province Jul-Sep 20 Status
58,750   Basali ZdS, Tshopo Province Jul-Sep 20 Status
117,700   Basoko ZdS, Tshopo Province Jul-Sep 20 Status
74,100   Bengamisa ZdS, Tshopo Province Jul-Sep 20 Status
105,500   Isangi ZdS, Tshopo Province Jul-Sep 20 Status
116,850   Kabondo ZdS, Tshopo Province Jul-Sep 20 Status
81,600   Lowa ZdS, Tshopo Province Jul-Sep 20 Status
111,650   Lubunga ZdS, Tshopo Province Jul-Sep 20 Status
215,600   Makiso-Kisangani ZdS, Tshopo Pro… Jul-Sep 20 Status
156,050   Mangobo ZdS, Tshopo Province Jul-Sep 20 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
82,700   Opala ZdS, Tshopo Province Jul-Sep 20 Status
45,100   Opienge ZdS, Tshopo Province Jul-Sep 20 Status
116,050   Tshopo ZdS, Tshopo Province Jul-Sep 20 Status
71,700   Ubundu ZdS, Tshopo Province Jul-Sep 20 Status
63,350   Wanie Rukula ZdS, Tshopo Province Jul-Sep 20 Status
115,200   Yabaondo ZdS, Tshopo Province Jul-Sep 20 Status
58,800   Yahisuli ZdS, Tshopo Province Jul-Sep 20 Status
125,400   Yahuma ZdS, Tshopo Province Jul-Sep 20 Status
108,100   Yakusu ZdS, Tshopo Province Jul-Sep 20 Status
82,900   Yaleko ZdS, Tshopo Province Jul-Sep 20 Status
67,300   Yalimbongo ZdS, Tshopo Province Jul-Sep 20 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete