logo
log in   
 
Funds raised US$349,687,008
Nets funded 166,760,771
People protected 300,169,388

Tshopo Province, 2021, Congo (Dem. Rep.)  

Summary

Nets: 2,323,650 LLINs
When: Jun 21
Distributed by:  PNLP/SANRU


2.3 million nets will be distributed in all 23 of the health zones in Tshopo province to achieve universal coverage of a population of 4.2 million people. This is part of a commitment made by AMF to fund 16.2 million nets for distribution in DRC in 2020.
Map

Details

 

Distribution

The distribution of nets typically takes place over a week to several months. The area District Health Service and staff typically take the lead in carrying out the on-the-ground distribution with the support and partnership of other organisations, often local or international NGOs, and with the national oversight of the National Malaria Control Program (NMCP), part of the Ministry of Health (MoH), and other funding and otherwise-contributing partners that form a distribution Task Force. Documentation is sought that shows nets were distributed as intended to beneficiaries. A distribution is typically divided into a series of locations.

Summary

  • Due to Covid-19, household registration and net distribution will take place simultaneously and began on 5 June 2021.
  • Distribution is yet to take place: TBA (to be advised)
  • Number of nets distributed: TBA
 

Locations

A distribution sometimes takes place in a number of locations. Each location may have its own pictures and video.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
49,850   Bafwagbogbo ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
57,850   Bafwasende ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
100,600   Banalia ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
62,950   Basali ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
126,100   Basoko ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
79,400   Bengamisa ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
113,050   Isangi ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
125,200   Kabondo ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
87,450   Lowa ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
119,600   Lubunga ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
231,000   Makiso-Kisangani ZdS, Tshopo Pro… Jun 21 Status Photos expected Videos expected
167,200   Mangobo ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
88,600   Opala ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
48,300   Opienge ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
124,350   Tshopo ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
76,800   Ubundu ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
67,850   Wanie Rukula ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
123,450   Yabaondo ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
63,000   Yahisuli ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
134,350   Yahuma ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
115,800   Yakusu ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
88,800   Yaleko ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected
72,100   Yalimbongo ZdS, Tshopo Province Jun 21 Status Photos expected Videos expected

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete

Opala ZdS, Tshopo Province, Congo (Dem. Rep.)

 

Status Being distributed Being distributed