Bas Uele Province, Congo (Dem. Rep.)  

Summary

Nets: 776,600 LLINs
When: Dec 20-Feb 21
Distributed by:  PNLP/TBD


0.8 million nets will be distributed in all 11 of the health zones in Bas Uele province to achieve universal coverage of a population of 1.4 million people. This is part of a commitment made by AMF to fund 16.2 million nets for distribution in DRC in 2020.
Map

Details

 

Donations funding nets     view donations funding non-net costs

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • Total funding required for nets: US$1,553,200 (est)
  • 8,368 donations from 5,415 donors in 71 countries
  • Smallest donation: US$1.00, largest donation: US$48,689
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
92,000   Aketi ZdS, Bas Uele Province Dec 20-Feb 21 Status
76,200   Ango ZdS, Bas Uele Province Dec 20-Feb 21 Status
33,150   Bili ZdS, Bas Uele Province Dec 20-Feb 21 Status
87,750   Bondo ZdS, Bas Uele Province Dec 20-Feb 21 Status
124,750   Buta ZdS, Bas Uele Province Dec 20-Feb 21 Status
81,200   Dingila ZdS, Bas Uele Province Dec 20-Feb 21 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
46,450   Likati ZdS, Bas Uele Province Dec 20-Feb 21 Status
48,100   Monga ZdS, Bas Uele Province Dec 20-Feb 21 Status
77,750   Poko ZdS, Bas Uele Province Dec 20-Feb 21 Status
49,900   Titule ZdS, Bas Uele Province Dec 20-Feb 21 Status
59,350   Viadana ZdS, Bas Uele Province Dec 20-Feb 21 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete