logo
log in   
 
Funds raised US$503,275,578
Nets funded 228,635,021
People protected 411,543,038

Mongala Province, 2022, Congo (Dem. Rep.)  

Summary

Nets: 1,915,850 LLINs
When: Mar-Apr 23
Distributed by:  PNLP/TBD


1.9 million nets will be distributed in all Health Zones in 12 regions to achieve universal coverage (all sleeping spaces covered) across a population of some 3.5 million people.
Map

Details

 

Donations funding nets    

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 5,112 donations from 4,285 donors in 68 countries
  • Smallest donation: AUD1.00, largest donation: US$250,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
221,850   Binga ZdS Mar-Apr 23 Status
103,400   Bongandanga ZdS Mar-Apr 23 Status
114,050   Bosomanzi ZdS Mar-Apr 23 Status
108,350   Bosomondanda ZdS Mar-Apr 23 Status
160,900   Bosondjo ZdS Mar-Apr 23 Status
172,350   Bumba ZdS Mar-Apr 23 Status
261,650   Lisala ZdS Mar-Apr 23 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
93,250   Lolo ZdS Mar-Apr 23 Status
213,950   Pimu ZdS Mar-Apr 23 Status
114,700   Yamaluka ZdS Mar-Apr 23 Status
238,450   Yambuku ZdS Mar-Apr 23 Status
112,950   Yamongili ZdS Mar-Apr 23 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete