Participants 556,201
US$ 346,225,322
Nets 165,028,005

Haut Katanga Province, 2023, Congo (Dem. Rep.)  

Summary

Nets: 4,540,350 LLINs
When: Apr 23
Distributed by:  NMCP/Various


4.5 million nets will be distributed in all 27 Health Zones to achieve universal coverage (all sleeping spaces covered) across a population of some 8.1 million people.
Map

Details

 

Donations funding nets     view donations funding non-net costs

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 15 donations from 1 donors in 1 countries
  • Smallest donation: US$250,000.00, largest donation: US$500,000
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
82,700   Kafubu ZdS, Haut Katanga Province Dec 22-Jan 23 Status
33,800   Kamalondo ZdS, Haut Katanga Prov… Dec 22-Jan 23 Status
124,900   Kambove ZdS, Haut Katanga Province Dec 22-Jan 23 Status
432,250   Kampemba ZdS, Haut Katanga Province Dec 22-Jan 23 Status
124,000   Kapolowe ZdS, Haut Katanga Province Dec 22-Jan 23 Status
119,000   Kasenga ZdS, Haut Katanga Province Dec 22-Jan 23 Status
123,250   Kashobwe ZdS, Haut Katanga Province Dec 22-Jan 23 Status
147,350   Katuba ZdS, Haut Katanga Province Dec 22-Jan 23 Status
176,000   Kenya ZdS, Haut Katanga Province Dec 22-Jan 23 Status
224,150   Kikula ZdS, Haut Katanga Province Dec 22-Jan 23 Status
49,650   Kilela Balanda ZdS, Haut Katanga… Dec 22-Jan 23 Status
275,400   Kilwa ZdS, Haut Katanga Province Dec 22-Jan 23 Status
170,050   Kipushi ZdS, Haut Katanga Province Dec 22-Jan 23 Status
293,350   Kisanga ZdS, Haut Katanga Province Dec 22-Jan 23 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
36,700   Kowe ZdS, Haut Katanga Province Dec 22-Jan 23 Status
158,650   Likasi ZdS, Haut Katanga Province Dec 22-Jan 23 Status
228,600   Lubumbashi ZdS, Haut Katanga Pro… Dec 22-Jan 23 Status
77,200   Lukafu ZdS, Haut Katanga Province Dec 22-Jan 23 Status
100,550   Mitwaba ZdS, Haut Katanga Province Dec 22-Jan 23 Status
126,750   Mufunga-Sampwe ZdS, Haut Katanga… Dec 22-Jan 23 Status
291,500   Mumbunda ZdS, Haut Katanga Province Dec 22-Jan 23 Status
70,250   Panda ZdS, Haut Katanga Province Dec 22-Jan 23 Status
208,150   Pweto ZdS, Haut Katanga Province Dec 22-Jan 23 Status
342,950   Rwashi ZdS, Haut Katanga Province Dec 22-Jan 23 Status
217,750   Sakania ZdS, Haut Katanga Province Dec 22-Jan 23 Status
208,500   Tshamilemba ZdS, Haut Katanga Pr… Dec 22-Jan 23 Status
96,950   Vangu ZdS, Haut Katanga Province Dec 22-Jan 23 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete