Summary

Nets: 2,513,809 LLINs
When: Nov-Dec 23
Distributed by:  NMCP/Various


2.4 million nets will be distributed in all 23 Health Zones to achieve universal coverage (all sleeping spaces covered) across a population of some 4.3 million people.
Map

Details

 

Distribution

The distribution of nets typically takes place over a week to several months. The area District Health Service and staff typically take the lead in carrying out the on-the-ground distribution with the support and partnership of other organisations, often local or international NGOs, and with the national oversight of the National Malaria Control Program (NMCP), part of the Ministry of Health (MoH), and other funding and otherwise-contributing partners that form a distribution Task Force. Documentation is sought that shows nets were distributed as intended to beneficiaries. A distribution is typically divided into a series of locations.

Summary

  • Distribution took place between: TBA (to be advised)
  • Number of nets distributed: TBA
 

Locations

A distribution sometimes takes place in a number of locations. Each location may have its own pictures and video.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
80,860   Bafwagbogbo ZdS Nov-Dec 23 Status Photos expected Videos expected
115,849   Bafwasende ZdS Nov-Dec 23 Status Photos expected Videos expected
106,250   Banalia ZdS Nov-Dec 23 Status Photos expected Videos expected
74,550   Basali ZdS Nov-Dec 23 Status Photos expected Videos expected
128,450   Basoko ZdS Nov-Dec 23 Status Photos expected Videos expected
80,300   Bengamisa ZdS Nov-Dec 23 Status Photos expected Videos expected
119,500   Isangi ZdS Nov-Dec 23 Status Photos expected Videos expected
140,300   Kabondo ZdS Nov-Dec 23 Status Photos expected Videos expected
77,550   Lowa ZdS Nov-Dec 23 Status Photos expected Videos expected
132,300   Lubunga ZdS Nov-Dec 23 Status Photos expected Videos expected
271,850   Makiso-Kisangani ZdS Nov-Dec 23 Status Photos expected Videos expected
163,800   Mangobo ZdS Nov-Dec 23 Status Photos expected Videos expected

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
95,700   Opala ZdS Nov-Dec 23 Status Photos expected Videos expected
47,150   Opienge ZdS Nov-Dec 23 Status Photos expected Videos expected
110,300   Tshopo ZdS Nov-Dec 23 Status Photos expected Videos expected
78,900   Ubundu ZdS Nov-Dec 23 Status Photos expected Videos expected
57,450   Wanie Rukula ZdS Nov-Dec 23 Status Photos expected Videos expected
119,650   Yabaondo ZdS Nov-Dec 23 Status Photos expected Videos expected
65,150   Yahisuli ZdS Nov-Dec 23 Status Photos expected Videos expected
144,600   Yahuma ZdS Nov-Dec 23 Status Photos expected Videos expected
118,200   Yakusu ZdS Nov-Dec 23 Status Photos expected Videos expected
107,300   Yaleko ZdS Nov-Dec 23 Status Photos expected Videos expected
77,850   Yalimbongo ZdS Nov-Dec 23 Status Photos expected Videos expected

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete

Banalia ZdS, Congo (Dem. Rep.)

 

Status Being distributed Being distributed