logo
log in   
 
Participants 556,201
US$ 346,289,582
Nets 165,060,135

Tshopo Province, 2023, Congo (Dem. Rep.)  

Summary

Nets: 2,426,700 LLINs
When: Oct 23
Distributed by:  NMCP/Various


2.4 million nets will be distributed in all 23 Health Zones to achieve universal coverage (all sleeping spaces covered) across a population of some 4.3 million people.
Map

Details

 

Donations funding nets     view donations funding non-net costs

We allocate donations individually to specific distributions. This is consistent with being accountable and transparent with the funds we receive. It also allows donors to engage with a net distribution by being able to follow the progress of the nets they have funded. A distribution is typically divided into a series of locations.

Summary

  • 0 donations from 0 donors in 0 countries
  • Smallest donation: 1.00, largest donation: 0
  • (*Figures are 'to date' as funds are still being allocated)

Locations

Click on a location to view the donations that funded it.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
51,450   Bafwagbogbo ZdS, Tshopo Province May-Jun 23 Status
58,150   Bafwasende ZdS, Tshopo Province May-Jun 23 Status
106,250   Banalia ZdS, Tshopo Province May-Jun 23 Status
74,550   Basali ZdS, Tshopo Province May-Jun 23 Status
128,450   Basoko ZdS, Tshopo Province May-Jun 23 Status
80,300   Bengamisa ZdS, Tshopo Province May-Jun 23 Status
119,500   Isangi ZdS, Tshopo Province May-Jun 23 Status
140,300   Kabondo ZdS, Tshopo Province May-Jun 23 Status
77,550   Lowa ZdS, Tshopo Province May-Jun 23 Status
132,300   Lubunga ZdS, Tshopo Province May-Jun 23 Status
271,850   Makiso-Kisangani ZdS, Tshopo Pro… May-Jun 23 Status
163,800   Mangobo ZdS, Tshopo Province May-Jun 23 Status

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus
95,700   Opala ZdS, Tshopo Province May-Jun 23 Status
47,150   Opienge ZdS, Tshopo Province May-Jun 23 Status
110,300   Tshopo ZdS, Tshopo Province May-Jun 23 Status
78,900   Ubundu ZdS, Tshopo Province May-Jun 23 Status
57,450   Wanie Rukula ZdS, Tshopo Province May-Jun 23 Status
119,650   Yabaondo ZdS, Tshopo Province May-Jun 23 Status
65,150   Yahisuli ZdS, Tshopo Province May-Jun 23 Status
144,600   Yahuma ZdS, Tshopo Province May-Jun 23 Status
118,200   Yakusu ZdS, Tshopo Province May-Jun 23 Status
107,300   Yaleko ZdS, Tshopo Province May-Jun 23 Status
77,850   Yalimbongo ZdS, Tshopo Province May-Jun 23 Status

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Pre-manufacture
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete