Bas Uele Province, 2024, Congo (Dem. Rep.)  

Summary

Nets: 879,600 LLINs
When: Aug-Sep 24
Distributed by:  PNLP/SANRU


0.9 million nets will be distributed in all 11 health zones to achieve universal coverage (all sleeping spaces covered) across a population of some 1.6 million people.
Map

Details

 

Distribution

The distribution of nets typically takes place over a week to several months. The area District Health Service and staff typically take the lead in carrying out the on-the-ground distribution with the support and partnership of other organisations, often local or international NGOs, and with the national oversight of the National Malaria Control Program (NMCP), part of the Ministry of Health (MoH), and other funding and otherwise-contributing partners that form a distribution Task Force. Documentation is sought that shows nets were distributed as intended to beneficiaries. A distribution is typically divided into a series of locations.

Summary

  • Distribution took place between: TBA (to be advised)
  • Number of nets distributed: TBA
 

Locations

A distribution sometimes takes place in a number of locations. Each location may have its own pictures and video.

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
98,650   Aketi ZdS Aug-Sep 24 Status Photos expected Videos expected
74,550   Ango ZdS Aug-Sep 24 Status Photos expected Videos expected
49,200   Bili ZdS Aug-Sep 24 Status Photos expected Videos expected
88,150   Bondo ZdS Aug-Sep 24 Status Photos expected Videos expected
143,100   Buta ZdS Aug-Sep 24 Status Photos expected Videos expected
88,200   Dingila ZdS Aug-Sep 24 Status Photos expected Videos expected

Survey status

Surveys take place 6, 18, 30 and 42 months post-distribution. A survey of 50 households provides sample information on what proportion of nets continue to be used, if they are used correctly and the state of the nets.

  • Expected
  • Not expected
  • Very good/good
  • Acceptable
  • Not OK
  • Partner Refused
# LLINs LocationWhenStatus  
57,850   Likati ZdS Aug-Sep 24 Status Photos expected Videos expected
56,650   Monga ZdS Aug-Sep 24 Status Photos expected Videos expected
90,550   Poko ZdS Aug-Sep 24 Status Photos expected Videos expected
56,600   Titule ZdS Aug-Sep 24 Status Photos expected Videos expected
76,100   Viadana ZdS Aug-Sep 24 Status Photos expected Videos expected

Distribution status

The bednet distribution programmes go through a number of different states from being manufactured to being installed over a head/bed:
  • Being manufactured
  • Ready at factory
  • En-route to country
  • Arrived in country
  • En-route to zone
  • Being distributed
  • Distribution complete